Calculators / Drywall, paint and lighting
Drywall calculator: how many sheets do I need?
Put in the room or the walls, the doors and windows, the sheet size and where it goes. You get sheets for each surface and the thickness it takes, the screws, the buckets of mud and the rolls of tape, and in a garage the code’s rule for the walls and ceiling it shares with the house.
Updated · How we check our numbers
542 sq ft of walls and ceiling
17 sheets of 4 × 8
12 × 14 ft, 8 ft walls and the ceiling: 17 sheets of 4 × 8 1/2 in, or 12 of 4 × 12; about 2 pails of USG Sheetrock All Purpose and 1 roll of tape.
- Sheets
- 174 × 8, 1/2 in
- Screws
- about 5201-1/4 in Type W
- All Purpose
- 2 pails5.4 gal; 4.5 gal pails, or 2 cartons of 3.5
- Tape
- 1 roll201 ft; 250 ft rolls
- Walls
- 11.7 sheets374 sq ft · 1/2 in · 14 hung
- Ceiling
- 5.3 sheets168 sq ft · 1/2 in · 6 hung
As an Amazon Associate we earn from qualifying purchases.
Estimate for planning only, not professional advice. Check the manufacturer’s instructions, your local code and a licensed professional before you buy, build or install. Use at your own risk. Terms.
Paint for the new drywall542 sq ft of new drywall, primed the way each maker says
Add up wall lengthsFeet and inches off the tape, added before you put them in.
walls = 2 × (14 + 12) ft × 8 ft = 416 sq ft
less 1 door at 32 × 80 in and 2 windows at 36 × 48 in = 42 sq ft → 374 sq ft of wall
ceiling = 14 × 12 ft = 168 sq ft
walls sheets = 374 ÷ 32 sq ft a 4 × 8 sheet = 11.7, 1/2 in
ceiling sheets = 168 ÷ 32 sq ft a 4 × 8 sheet = 5.3, 1/2 in
sheets = 17 1/2 in (each thickness rounded up)
walls screws = 11.7 sheets × 28 a sheet (7 studs × 4, 16 in apart) = 327
ceiling screws = 5.3 sheets × 35 a sheet (7 joists × 5, 12 in apart) = 184
USG Sheetrock All Purpose = 542 sq ft × 10 gal per 1,000 = 5.4 gal → 2 pails of 4.5 gal
tape = 542 sq ft × 370 ft per 1,000 = 201 ft → 1 roll of 250 ft
Sheets laid sideways across the studs, top course first; the cut piece swaps ends course to course so end joints don't line up. Doors and windows aren't drawn: hang over them and cut them out.
The same job in each sheet size
542 sq ft- 4 × 8 ft20 hung course by course · about 520 screws17 sheets
Your pick.
- 4 × 10 ft16 hung course by course · about 470 screws14 sheets
- 4 × 12 ft13 hung course by course · about 490 screws12 sheets
- 4 × 14 ft11 hung course by course · about 460 screws10 sheets
- 4 × 16 ft11 hung course by course · about 480 screws9 sheets
- 54 in × 8 ft20 hung course by course · about 560 screws16 sheets
- 54 in × 10 ft17 hung course by course · about 520 screws13 sheets
- 54 in × 12 ft15 hung course by course · about 540 screws11 sheets
- 54 in × 14 ft11 hung course by course · about 510 screws9 sheets
- 54 in × 16 ft11 hung course by course · about 520 screws8 sheets
By area, USG’s way; then hung course by course with offcuts reused on the same surface. USG makes 8 to 16 ft lengths in 4 ft and 54 in widths; yards stock fewer.
USG and IRC Table R702.3.5: 1/2 in on walls, studs up to 24 in apart.
USG: 1/2 in on joists up to 16 in apart, either way.
USG: "If possible, span the entire wall or ceiling from corner to corner." Your longest wall is 14 ft: 14 ft sheets span it with no end joint. USG makes 8 to 16 ft; ask what the yard stocks.
USG counts sheets from the area less big openings: 17 sheets. Hung course by course, with no openings taken off and offcuts used only on the same surface, the same room takes 20. Buy 20 if you won't piece in short offcuts or patch over the doors and windows. USG gives no waste factor, so we add none.
USG’s coverage, 10 gal per 1,000 sq ft, is for "the flat joints, inside corners and outside corners using metal corner bead, in a typical room", and "can vary widely". A skim coat takes more. Plus 3, the lightweight one, covers about 9.4 gal per 1,000.
1-1/4 in Type W bugle head screws (USG), at least 3/8 in from the edges, 16 in apart on the walls and 12 in apart on the ceiling. USG’s table puts it at 1.5 lb for this area. The handbook says to allow for loss; it gives no number.
How we work it out
Sheets. USG's own way: the area of each wall, less big openings like doors and windows, plus the ceiling, over the area of one sheet, rounded up. USG gives no waste factor, so we add none.
sheets = (walls − doors − windows + ceiling) ÷ sheet area, rounded up for each thickness
Hung course by course. We also lay the sheets out the way USG says to hang them: sideways across the studs, the top course first, the longest sheets, end joints offset from one course to the next, and a filler strip at the bottom. Short pieces come from offcuts on the same surface. That count, with openings sheeted over, is the most a careful hanger needs.
Thickness. 1/2 in on walls and on ceilings with joists up to 16 in apart, or 24 in across the joists (USG and IRC Table R702.3.5). In a garage, IRC Table R302.6 as building departments quote it: at least 1/2 in on the garage side of walls to the house and attic, and 5/8 in Type X under rooms above.
Screws. Each sheet crosses a stud or joist every 16 or 24 in, and takes a screw every 12 in on ceilings and 16 in on walls (12 in with studs 24 in apart, 6 in for Type X under rooms). That's how USG's handbook counts screws per 1,000 sq ft.
Mud and tape. USG: 10 gallons of All Purpose (9.4 of Plus 3) and 370 ft of tape per 1,000 sq ft of drywall, for the joints and corners of a typical room.
Where the numbers come from
- USG Sheetrock Brand Installation and Finishing Guide, J371/rev. 9-15 (a dealer’s copy) (read Nov 9 2026)
- USG Sheetrock Brand UltraLight Panels 1/2 in, submittal sheet WB2501/rev. 4-20 (Lowe’s copy) (read Nov 9 2026)
- USG Sheetrock Brand Firecode X Panels 5/8 in Type X, submittal sheet WB2964/rev. 3-20 (read Nov 9 2026)
- National Gypsum Gold Bond Brand Gypsum Board, submittal 110638 Rev. 04/15 (read Nov 9 2026)
- USG Sheetrock Brand All Purpose Joint Compound, data sheet J1969/rev. 10-16 (a dealer’s copy) (read Nov 9 2026)
- USG Sheetrock Brand Plus 3 Joint Compound, submittal J498A/rev. 6-22 (read Nov 9 2026)
- USG Sheetrock Brand Heavy Joint Tape, submittal J1393/rev. 10-15 (Home Depot’s copy) (read Nov 9 2026)
- USG Gypsum Construction Handbook, appendix: gypsum board screw usage (2009 edition, InspectApedia’s copy) (read Nov 9 2026)
- MyBuildingPermit.com (Washington building departments), Construction Tip Sheet 06: Residential Garage Separation, 2021 IRC, Mar 15 2024 (read Nov 9 2026)
- City of Grand Rapids, MN, Building Safety Division: Gypsum Wallboard handout (2015 Minnesota State Building Code, IRC Table R702.3.5) (read Nov 9 2026)
The same room
Garages
More calculators
- Paint calculatorHow many gallons of paint for my room, and do I need primer?
- Recessed lightingHow many pot lights, how far apart and how far from the walls?
- Feet and inchesAdd, subtract or convert lengths the way a tape reads them.
- Will it fit through the door?Will the couch, mattress or dresser get through the door, hall and stairs?
- Moving truck and storage sizeWhat size moving truck, storage unit or PODS for my home, and what fits in a 10x10?
- ADU costWhat does an ADU cost to build, with permit and fees?
- Fair market rentWhat could an ADU rent for in my ZIP code, and how long to pay back the build?
- Home warrantyIs a home warranty worth it for my house?